Skip to content
PlennoPLENNO
Fit-out Execution

Commercial fit-out from the design of the brand, the franchise or your studio. With review and planning before the works begin.

Three ways in

01

You have the brand manual and design

You need someone to execute it without interpreting it creatively. The drawing reaches the site exactly as approved.

02

You're a franchisee with the brand's design

The design is non-negotiable and has precise requirements. We execute within the specification book, without deviating.

03

You're an architecture studio

You need an executor who takes your design to site without changing the drawing. It's the channel where we work most with technical peers.

  • 01Review of the received design
  • 02Survey and confirmation of measurements on site
  • 03Works budget itemised by trade
  • 04Contracting and coordination of technical operators
  • 05Shopping-centre interface during the works
  • 06Execution in the seven-stage site sequence
  • 07Supervision through numbered site visits
  • 08Technology commissioning and handover